<rss xmlns:atom="http://www.w3.org/2005/Atom" version="2.0">
  <channel>
    <title>HS2 News and Information - News</title>
    <link>https://mediacentre.hs2.org.uk/</link>
    <description>News and information from HS2 for the media</description>
    <language>en-GB</language>
    <generator>PRgloo</generator>
    <atom:link href="https://mediacentre.hs2.org.uk/feed/rss" rel="self" type="application/rss+xml" />
    <item>
      <guid isPermaLink="false">6a4cc987ef42c677880cad9d</guid>
      <link>https://mediacentre.hs2.org.uk/news/hs2s-reveals-first-completed-green-tunnel</link>
      <title>HS2’s reveals first completed ‘green’ tunnel</title>
      <description>&lt;ul&gt;
&lt;li&gt;'Green' cut &amp;amp; cover tunnel completed using over 1m cubic metres of material bored to create HS2's Northolt tunnel&lt;/li&gt;
&lt;li&gt;New &lt;a href="https://www.youtube.com/watch?v=dmlje80AnL0"&gt;YouTube video&lt;/a&gt; illustrates HS2 construction progress&lt;/li&gt;
&lt;/ul&gt;</description>
      <pubDate>Tue, 07 Jul 2026 10:07:00 Z</pubDate>
      <enclosure type="image/jpeg" url="https://cdn.prgloo.com/media/555fea4b4ae146208bf472ebfb9ca3b8.jpg?width=400" length="14389661"></enclosure>
    </item>
    <item>
      <guid isPermaLink="false">6a4642b6ef42c677880c7bc4</guid>
      <link>https://mediacentre.hs2.org.uk/news/final-piece-of-the-jigsaw-hs2-engineers-assemble-1-5-mile-pre-cast-tunnel</link>
      <title>HS2 engineers assemble 1.5-mile pre-cast tunnel</title>
      <description>&lt;ul&gt;
&lt;li&gt;&lt;a href="https://vimeo.com/1206462123/b8e808e212?share=copy&amp;amp;fl=sv&amp;amp;fe=ci"&gt;View and embed new drone footage&lt;/a&gt; and &lt;a href="https://vimeo.com/1206462122/8d2fee1165"&gt;timelapse&lt;/a&gt; showing the last of&amp;nbsp;more than&amp;nbsp;5,000 concrete segments&amp;nbsp;being&amp;nbsp;lifted into position for the Chipping Warden cut-and-cover ‘green tunnel’.&amp;nbsp;&lt;/li&gt;
&lt;li&gt;Productivity improvements helped to double the rate of installation over the last two years.&amp;nbsp;&lt;/li&gt;
&lt;/ul&gt;
&lt;ul&gt;
&lt;li&gt;The completion of the tunnel structure will allow HS2’s engineers to focus on the earthworks that will blend the tunnel into the surrounding countryside. &lt;a href="https://mediacentre.hs2.org.uk/resources/f/construction/wendover-to-warwickshire/chipping-warden-green-tunnel"&gt;Download the latest images&lt;/a&gt;.&amp;nbsp;&lt;/li&gt;
&lt;/ul&gt;</description>
      <pubDate>Fri, 03 Jul 2026 08:15:00 Z</pubDate>
      <enclosure type="image/jpeg" url="https://cdn.prgloo.com/media/081225c623af438c892170e4553f7d8a.jpg?width=400" length="45072187"></enclosure>
    </item>
    <item>
      <guid isPermaLink="false">6a428c63ef42c677880c52fb</guid>
      <link>https://mediacentre.hs2.org.uk/news/new-hs2-recruitment-hub-to-support-job-seekers</link>
      <title>New HS2 recruitment hub to support job seekers</title>
      <description><![CDATA[<p><strong>A new one-stop-shop has been opened for job seekers looking for opportunities on major infrastructure schemes as part of the HS2 programme. </strong></p>]]></description>
      <pubDate>Tue, 30 Jun 2026 12:34:00 Z</pubDate>
      <enclosure type="image/jpeg" url="https://cdn.prgloo.com/media/bf5173d694434976989fc9751cd6d5cc.jpg?width=400" length="4315717"></enclosure>
    </item>
    <item>
      <guid isPermaLink="false">6a3bbb3aef42c677880c141b</guid>
      <link>https://mediacentre.hs2.org.uk/news/hs2-lifts-first-huge-beams-for-birminghams-curzon-street-station</link>
      <title>HS2 lifts first huge beams for Birmingham’s Curzon Street station</title>
      <description>&lt;ul&gt;
&lt;li&gt;&lt;a href="https://mediacentre.hs2.org.uk/resources/f/construction/curzon-street-station/construction-2/installation-of-the-station-deck-beams-from-june-2026"&gt;Download new images&lt;/a&gt; showing the installation of the first prestressed precast concrete beams that will support Curzon Street’s seven platforms.&lt;/li&gt;
&lt;li&gt;&lt;a href="https://vimeo.com/1203394576/523e3315a8?share=copy&amp;amp;fl=sv&amp;amp;fe=ci"&gt;Download footage&lt;/a&gt; showing the start of work on the 13,370m2 square metre deck – the size of two football pitches – that will support the eastern end of the new city-centre station.&lt;/li&gt;
&lt;/ul&gt;</description>
      <pubDate>Wed, 24 Jun 2026 11:41:00 Z</pubDate>
      <enclosure type="image/jpeg" url="https://cdn.prgloo.com/media/e9ed082315214278931c615edfa30239.jpg?width=400" length="55025116"></enclosure>
    </item>
    <item>
      <guid isPermaLink="false">6a312f524b2abdbf44e5a1b9</guid>
      <link>https://mediacentre.hs2.org.uk/news/hs2-to-install-beams-on-m42-twin-box</link>
      <title>HS2 to install beams on M42 ‘twin box’</title>
      <description>&lt;ul&gt;
&lt;li&gt;&lt;a href="https://vimeo.com/1200707914/f829778d7f?share=copy&amp;amp;fl=sv&amp;amp;fe=ci"&gt;B-roll footage&lt;/a&gt; and &lt;a href="https://visual.library.hs2.org.uk/assetbank-hs2/images/assetbox/626c9c67-b12c-493e-809e-2b474886cee6/assetbox.html"&gt;images&lt;/a&gt; show the twin box being built over the M42&lt;/li&gt;
&lt;li&gt;Complex installation will require four weekend carriageway closures&lt;/li&gt;
&lt;li&gt;The first closure affects the M42 J5A to 7 northbound, ​and J6 to 7 southbound. The closure is from 9pm on Friday, 26&lt;sup&gt;th&lt;/sup&gt; June to 5am on Monday, 29&lt;sup&gt;th&lt;/sup&gt; June 2026&lt;/li&gt;
&lt;li&gt;Drivers are encouraged to plan ahead and follow approved diversion routes&lt;/li&gt;
&lt;/ul&gt;</description>
      <pubDate>Wed, 17 Jun 2026 08:00:00 Z</pubDate>
      <enclosure type="image/jpeg" url="https://cdn.prgloo.com/media/f0a59208d99c4467b8bdb13c42ef7a3d.jpg?width=400" length="9541764"></enclosure>
    </item>
    <item>
      <guid isPermaLink="false">6a170118ed75cc8d12330e28</guid>
      <link>https://mediacentre.hs2.org.uk/news/bolton-based-booth-industries-begins-manufacturing-hs2-tunnel-cross-passage-doors</link>
      <title>Bolton-based Booth Industries begins manufacturing HS2 tunnel cross-passage doors</title>
      <description>&lt;ul&gt;
&lt;li&gt;&lt;a href="https://www.youtube.com/watch?v=CeotdKBXmpE"&gt;View and embed a new video&lt;/a&gt; showing the cross-passage doors being manufactured in Bolton and the first test installation within the Chiltern tunnel&lt;/li&gt;
&lt;li&gt;&lt;a href="https://mediacentre.hs2.org.uk/resources/f/railway-systems/tunnel-systems/cross-passage-doors"&gt;Download new images&lt;/a&gt; of the safety doors doors being manufactured and the first test-installation in the Chilterns tunnel&lt;/li&gt;
&lt;/ul&gt;</description>
      <pubDate>Thu, 28 May 2026 08:54:00 Z</pubDate>
      <enclosure type="image/jpeg" url="https://cdn.prgloo.com/media/d02db909da91420a97ec7666549aa9a1.jpg?width=400" length="5939489"></enclosure>
    </item>
    <item>
      <guid isPermaLink="false">6a096ddfed75cc8d1232935b</guid>
      <link>https://mediacentre.hs2.org.uk/news/hs2-viaducts-to-be-installed-over-busy-motorways-in-major-milestone-for-new-high-speed-line</link>
      <title>HS2 viaducts to be installed over busy motorways in major milestone</title>
      <description>&lt;ul&gt;
&lt;li&gt;Motorists given advanced warning of M6 and M42 works between June and November&amp;nbsp;&amp;nbsp;&lt;/li&gt;
&lt;li&gt;Number of motorway closures reduced to minimise disruption, with diversion routes put in place&amp;nbsp;&amp;nbsp;&lt;/li&gt;
&lt;li&gt;HS2 works with National Highways, Birmingham Airport and NEC&amp;nbsp;to&amp;nbsp;coordinate motorway programme&amp;nbsp;&lt;/li&gt;
&lt;li&gt;&lt;a href="https://vimeo.com/1192559315/7b998cdbee?share=copy&amp;amp;fl=sv&amp;amp;fe=ci"&gt;B-roll footage&lt;/a&gt; shows progress on HS2's construction works around the motorway network&lt;/li&gt;
&lt;li&gt;&lt;a href="https://visual-library.hs2.org.uk/s/jt6pmbj97gr5ppvh8959x7p"&gt;New images&lt;/a&gt; show progress on the Water Orton viaducts and the twin box structure, which will be extended over the motorway&lt;/li&gt;
&lt;/ul&gt;</description>
      <pubDate>Mon, 18 May 2026 11:06:00 Z</pubDate>
      <enclosure type="image/jpeg" url="https://cdn.prgloo.com/media/e3f6e4011af341e7a48999ce950c4438.jpg?width=400" length="11977039"></enclosure>
    </item>
    <item>
      <guid isPermaLink="false">6a02fbde54035d2c30ac7ce7</guid>
      <link>https://mediacentre.hs2.org.uk/news/hs2-celebrates-completion-of-tallest-bridge-ahead-of-complex-launch-operation</link>
      <title>HS2 celebrates completion of tallest bridge ahead of complex launch operation</title>
      <description>&lt;ul&gt;
&lt;li&gt;New images and video released today show the fully assembled bridge&lt;/li&gt;
&lt;li&gt;Engineers prepare for the three-stage operation to launch the 4,200-tonne structure into position over the Birmingham – Lichfield railway line&lt;/li&gt;
&lt;li&gt;Link to new B-roll footage showing the completed structure from different angles&amp;nbsp;&lt;a href="https://vimeo.com/1191546022/eabc972a66?share=copy&amp;amp;fl=sv&amp;amp;fe=ci" target="_blank" rel="noreferrer noopener" title="https://vimeo.com/1191546022/eabc972a66?share=copy&amp;amp;fl=sv&amp;amp;fe=ci"&gt;https://vimeo.com/1191546022/eabc972a66?share=copy&amp;amp;fl=sv&amp;amp;fe=ci&lt;/a&gt;&lt;/li&gt;
&lt;/ul&gt;</description>
      <pubDate>Wed, 13 May 2026 08:30:00 Z</pubDate>
      <enclosure type="image/jpeg" url="https://cdn.prgloo.com/media/7165322a6cf6453fa8e2520de75dbd22.jpg?width=400" length="6464422"></enclosure>
    </item>
    <item>
      <guid isPermaLink="false">69fdad3a54035d2c30ac610a</guid>
      <link>https://mediacentre.hs2.org.uk/news/high-tech-hs2-train-depot-and-control-centre-deal-provides-jobs-boost-for-birmingham</link>
      <title>High-tech HS2 train depot and control centre deal provides jobs boost for Birmingham</title>
      <description>&lt;ul&gt;
&lt;li&gt;&lt;a href="https://mediacentre.hs2.org.uk/resources/f/construction/washwood-heath-depot-and-network-control-centre/cgis-5"&gt;Download images&lt;/a&gt; showing how the high-tech Rolling Stock Depot and Network Integrated Control Centre will look once complete, &lt;a href="https://mediacentre.hs2.org.uk/resources/f/construction/washwood-heath-depot-and-network-control-centre/washwood-heath-construction-images"&gt;what the site looks like now&lt;/a&gt;, and &lt;a href="https://vimeo.com/1179599036/3e43fa0afe?share=copy&amp;amp;fl=sv&amp;amp;fe=ci"&gt;recent drone footage of the site&lt;/a&gt; at Washwood Heath, Birmingham.&lt;/li&gt;
&lt;/ul&gt;
&lt;ul&gt;
&lt;li&gt;Around 1,500 permanent jobs expected to be created at the depot and land freed up for development around the edges of the 70-hectare brown-field site. Plus around 500 construction jobs during the build of the facility.&lt;/li&gt;
&lt;li&gt;Contract award comes as HS2 undergoes a comprehensive reset to ensure the project is delivered efficiently and to the lowest reasonable cost.&lt;/li&gt;
&lt;/ul&gt;</description>
      <pubDate>Sun, 10 May 2026 23:05:00 Z</pubDate>
      <enclosure type="image/jpeg" url="https://cdn.prgloo.com/media/d9667165cbeb48f68a1ff02894e12df3.jpg?width=400" length="7964481"></enclosure>
    </item>
    <item>
      <guid isPermaLink="false">69f05d45e64d6d985f929c58</guid>
      <link>https://mediacentre.hs2.org.uk/news/hs2-to-start-work-on-new-improved-saltley-viaduct</link>
      <title>HS2 to start work on new improved Saltley Viaduct</title>
      <description><![CDATA[<p><strong>HS2 engineers are ready to start a major construction programme in Saltley, two miles northeast of Birmingham city centre, to facilitate the arrival of new high-speed rail services. </strong></p>]]></description>
      <pubDate>Tue, 28 Apr 2026 07:56:00 Z</pubDate>
      <enclosure type="image/jpeg" url="https://cdn.prgloo.com/media/843acf788c6849c692ae60d873752b48.jpg?width=400" length="7177555"></enclosure>
    </item>
  </channel>
</rss>