Go to content

HS2 staff and contractors watch the breakthrough of Florence at the end of her 10 mile drive under the Chilterns 270224

Download - 240227_ALIGN_HS2_Event_TBM Breakthrough_287.JPG
HS2 staff and contractors watch the breakthrough of Florence at the end of her 10 mile drive under the Chilterns 270224