Go to content

Excavating and building the 750-metre-long structure next to the tunnel portal, where HS2 trains will travel below ground level, before heading into Birmingham

Download - Excavating and building the 750-metre-long structure next to the tunnel portal, where HS2 trains will travel below ground level, before heading into Birmingham.jpg
Excavating and building the 750-metre-long structure next to the tunnel portal, where HS2 trains will travel below ground level, before heading into Birmingham