Go to content
Media
Contact us
Search
Search
Close
Search on HS2
Search
Some suggestions
HS2
Route Map
In your area map
What is HS2
Where we go
Why HS2
Menu
What is HS2
Building HS2
In your area
Supply chain
Jobs and skills
About us
News
Media blogs
Media gallery
Contact us
Media gallery
Search
Search
Resources Found
12
The 125 tonne cutterhead ready to be moved to the TBM
Download
The giant 125 tonne cutterhead being moved into place
Download
The giant cutterhead ready to be moved
Download
Members of the BBV team with the cutterhead before the lift
Download
The start of the operation to move the cutterhead into place
Download
The start of the cutterhead operation
Download
Preparing the cutterhead to be moved into position
Download
The cutterhead being lowered into the Bromford Tunnel launch pit
Download
The cutterhead being lowered into place by crane
Download
The cutterhead being moved to the front of the 125m long TBM
Download
The 125 tonne cutterhead being moved into place
Download
The cutterhead in place on the TBM in the 12-metre deep launch pit
Download