Interchange first beam lift for trace bridge south September 2020
Credit: HS2 Ltd
(LM. Interchange, modular, DfMA, pre-stressed, concrete, beam, crane, site, lifting, enabling works, bridge, abutment, modern methods of construction)
Internal Asset No. 19172
Download - HS2-VL-19172-Trace bridge first beam lift 28 Sept image 5.jpg