Go to content

Interchange first beam lift for trace bridge south September 2020

Credit: HS2 Ltd (LM. Interchange, modular, DfMA, pre-stressed, concrete, beam, crane, site, lifting, enabling works, bridge, abutment, modern methods of construction) Internal Asset No. 19172
Download - HS2-VL-19172-Trace bridge first beam lift 28 Sept image 5.jpg
Interchange first beam lift for trace bridge south September 2020: Credit: HS2 Ltd
(LM. Interchange, modular, DfMA, pre-stressed, concrete, beam, crane, site, lifting, enabling works, bridge, abutment, modern methods of construction)
Internal Asset No. 19172