Go to content

Tunnel segment rings, made by Pacadar UK, Kent, ready top construct the Atlas Road Logistics Tunnel

4,264 tunnel segments will be used to form 553 completed rings, constructing the 853m long logistics tunnel between Atlas Road and HS2's Old Oak Common station site. The logistics tunnel will support the construction of the HS2 twin-bored running tunnel - the Euston tunnel - between Old Oak Common and Euston station. Tags: TBM, Segments, Construction, Stations, Tunnelling, Logistics
Download - Assembly of HS2 TBM 'Lydia' at Atlas Road, London..jpg
Tunnel segment rings, made by Pacadar UK, Kent, ready top construct the Atlas Road Logistics Tunnel: 4,264 tunnel segments will be used to form 553 completed rings, constructing the 853m long logistics tunnel between Atlas Road and HS2's Old Oak Common station site. 
The logistics tunnel will support the construction of the HS2 twin-bored running tunnel - the Euston tunnel - between Old Oak Common and Euston station. 

Tags: TBM, Segments, Construction, Stations, Tunnelling, Logistics